The VOTER, March 2006, Volume 78, No. 6

DESAL PROPOSALS IN CALIFORNIA

Courtesy of Statewide Desal Response Group

Location Power Plant - Desal
Applicants/ Power Plant Operators
Public or Private Co-located with Power Plant? Capacity (Million Gallons per Day or MGD) Intake/ Discharge System Expected Cost NEPA/CEQA Status Desal Plant Status
Cambria Cambria Community Service District Public No 0.5 MGD Subsurface beach wells   Submitted Initial Study / Mitigated Negative Declaration (IS/MND)  
Carlsbad Encina Power Station - Poseidon Resources/ Cabrillo Power I LLC Private Yes 50 MGD Co-located with power plant, existing ocean intake / discharge $270 million for plant, $900-$1000 per acre-foot (without subsidies) EIR submitted, waiting for comments Pilot plant in operation, contract with City of Carlsbad
Carlsbad Encina Power Station - San Diego County Water Authority / Cabrillo Power I LLC Public Yes 50 MGD, with 30 MGD future expansion Co-located with power plant, existing ocean intake / discharge Budget number in CIP total $668 million (in future $s) Draft EIR release expected 1/2006  
Dana Point MWDOC Public No 10-25 MGD Subsurface beach wells Currently unknown n/a Feasibility study stage
El Segundo El Segundo Power - West Basin and Central Basin MWD / NRG Energy and Dynergy Inc. Public Yes 20 MGD Co-located with power plant, existing ocean intake / discharge $1000 per acre-foot cost, without subsidies n/a Pilot plant in operation
El Segundo Scattergood power station - LADWP Public Yes 10-25 MGD, 25 MGD most likely Co-located with power plant, existing ocean intake / discharge $1080 per acre-foot, w/o subsidies n/a Need union approval then board approval
Huntington Beach AES Power Plant - Poseidon Resources/AES Private Yes 50 MGD Co-located with power plant, existing ocean intake / discharge $240 million for plant REIR certified 9/2005, CUP to be voted on 11/21/2005  
Long Beach Haynes power plant - Long Beach Water Authority / LADWP/ US Bureau of Reclamation Public Yes n/a Subsurface beach wells   n/a Pilot plant in operation
Marina Fort Ord / Marina Coast Water District Public No 2.7 MGD Subsurface beach wells   EIR submitted, waiting for response to comments  
Monterey Ocean View Plaza (new development) Private   0.05 MGD Ocean pipeline   EIR certified 2004  
Moss Landing Moss Landing power plant - CAL AM Coastal Water Project / Duke Energy Private Yes 9-18 MGD Co-located with power plant, existing ocean intake / discharge $191 million PEA submitted, working on DEIR Environmental studies completed
Moss Landing Moss Landing power plant - Poseidon Resources / Pajaro-Sunny Mesa Private Yes 20-25 MGD Co-located with power plant, existing ocean intake / discharge     Plan being assessed, applied for Prop. 50 funds for Pilot plant
San Onofre San Onofre nuclear power plant - MWD, MWDOC and SDCWA / Southern CA Edison Public   Yes 100 MGD Co-located with power plant, existing ocean intake / discharge   n/a Feasibility study stage
San Rafael Marin Municipal Water District Public   10-15 MGD Seawater intake system, wastewater discharge system $90-100 million (total completion cost) EIR in progress Pilot plant in operation
Sand City City of Sand City Public No 0.27 MGD Subsurface beach wells      
Sand City Monterey Peninsula Water Management District Public No 3-7.5 MGD Subsurface beach wells/injection wells      
Santa Cruz City of Santa Cruz Public   2.5 MGD with possible future expansion to 3.5, then 4.5 MGD Pre-existing seawater intake system, wastewater discharge system $40 million EIR submitted, waiting for response to comments